01 • Project Overview

Reliable cadastral information for land development

Skymap Africa Ltd was engaged by Joban Group Limited to undertake a cadastral survey for Plot No. KWA/1234 at Kwale, Kenya. The assignment focused on tracing and verifying parcel boundaries, checking boundary beacons, determining parcel area and preparing a cadastral plan with a coordinate schedule.

The survey workflow combined field reconnaissance, GNSS/RTK observations, total station measurements and boundary verification, with data processing and plan preparation to support land-development planning.

Key Project Details

Project Information
ClientJoban Group Limited
Plot NumberKWA/1234
LocationKwale, Kenya
Surveyed Area450,000 m² (45.000 ha)
GNSS/RTK Accuracy±10 mm horizontal, ±5 mm vertical (as provided)
Datum / ProjectionArc 1960 / UTM Zone 37S
Survey Date28 October 2026
45 haReported parcel area
8Boundary beacons reported
GNSS / RTKSurvey positioning
CAD-readyPlan & coordinate schedule
02 • Survey Methodology

A structured field-to-deliverable workflow

Survey activities were organized to establish the available boundary evidence, record survey observations and prepare the parcel plan and supporting schedules.

STEP 01

Reconnaissance & Records Review

Review available cadastral information, inspect site access and identify boundary evidence.

STEP 02

Control Establishment

Confirm survey control and the coordinate reference system used for observations.

STEP 03

Boundary Survey

Observe boundary points using GNSS/RTK and total station methods where appropriate.

STEP 04

Processing & Plan Production

Check coordinates, compute parcel area and compile the cadastral plan and report.

03 • Survey Results

Key findings and coordinate schedule

The figures below reproduce the values shown in the supplied report preview. Verify against the signed survey records before official use.

Key Findings

  • Parcel boundaries were reported as traced and demarcated.
  • A total of eight boundary beacons (B1–B8) were reported confirmed or established.
  • The reported parcel area is 450,000 m² (45.000 ha).
  • A cadastral plan and coordinate schedule were prepared.
Survey control: Arc 1960 / UTM Zone 37S is the coordinate reference system stated in the supplied report preview.

Coordinate Schedule (Arc 1960 / UTM Zone 37S)

Point IDEasting (m)Northing (m)
B1528,467.2359,268,421.779
B2529,134.8719,268,589.415
B3529,846.0199,268,257.456
B4529,971.6329,267,741.906
B5529,602.1179,267,085.430
B6528,946.5509,267,033.808
B7528,488.2969,267,418.623
B8528,334.6279,267,975.241
04 • Survey Visuals

Parcel boundary and field observations

Two key visuals highlight the reported parcel outline and a typical instrument setup used during cadastral fieldwork.

Cadastral parcel boundary outline and area visual from the supplied report preview
Figure 1 — Cadastral parcel plan Boundary outline and reported parcel area. Use the approved signed plan for official cadastral purposes.
Surveyor using a total station in the field, as shown in the supplied report preview
Figure 2 — Field survey observations Survey instrument setup for boundary and detail observations.
05 • Deliverables

Outputs prepared for project use

Subject to the agreed scope and applicable cadastral requirements, the report package may include:

Cadastral Plan

Parcel boundary representation, beacon positions and supporting plan information.

Coordinate Schedule

Boundary point identifiers with easting and northing values in the stated reference system.

Survey Report

Methodology, field observations, area computation, findings and supporting photographic record.

Planning a land or cadastral survey?

Talk to Skymap Africa about boundary verification, GNSS/RTK surveys and cadastral mapping.

Request a Quote